03 - 6411 6437 inquiry@igesb.com

Track Record

Ship Building, Ship Repair & Engineering Work

NO. PROJECT TITLE HULL NO. BUYER CLASS DELIVERY DATE STATUS PROJECT
1 88.2m X 11.45 X 4m RHINE Cargo Container Barge 1068 International Ship Exchange B.V., Holland BV Nov 2008 Delivered
2 88.2m X 11.45 X 4m RHINE Cargo Container Barge 1069 International Ship Exchange B.V., Holland BV Delivered
3 41m Standby Utility Vessel 1072 Ajang Shipping Sdn Bhd, Malaysia ABS Delivered
4 41m Standby Utility Vessel 1073 Ajang Shipping Sdn Bhd, Malaysia ABS Delivered
5 34m Crewboat 1080 Gagasan Carriers Sdn Bhd BV Delivered
6 34m Crewboat 1081 Gagasan Carriers Sdn Bhd BV Delivered
7 34m Crewboat 1082 Gagasan Carriers Sdn Bhd BV Delivered
8 38m Crewboat 1083 Dinastia Jati Sdn Bhd BV Delivered
9 38m Crewboat 1084 Dinastia Jati Sdn Bhd BV Delivered
10 72M Platform Supply Vssl 1085 Slok Shipping Limited - Nigeria BV Delivered
11 35m Offshore terminal Tug 1090 Bakri Navigation Company Ltd., of Saudi Arabia. BV Delivered
12 35m Offshore terminal Tug 1091 Bakri Navigation Company Ltd., of Saudi Arabia. BV Delivered
13 29m Offshore Mooring Tug 1092 Bakri Navigation Company Ltd., of Saudi Arabia. BV Delivered
14 Mooring bot 1108 Eden Port Yemen GL Delivered
15 Mooring bot 1109 Eden Port Yemen GL Delivered
16 Mooring bot 1110 Eden Port Yemen GL Delivered
17 34m Crew Boat 1113 PJZ Marine Services Sdn Bhd BV Delivered
18 34m Crew Boat 1114 Kish ACME Iran BV Delivered
19 34m Crew Boat 1115 Kish ACME Iran BV Delivered
20 34m Crew Boat 1116 Kish ACME Iran BV Delivered
21 34m Crew Boat 1119 Warisan Alam Sdn Bhd BV Delivered
22 34m Crew Boat 1120 Warisan Alam Sdn Bhd BV Delivered
23 51M Multi purpose utility vessel 1159 Kish ACME Iran BV Delivered
24 22M OPL Vssl 1176 Agile Marine pte ltd, singapore BV Delivered
25 22M OPL Vssl 1177 Agile Marine pte ltd, singapore BV Delivered
26 22M OPL Vssl 1178 Agile Marine pte ltd, singapore BV Delivered
27 22M OPL Vssl 1179 Agile Marine pte ltd, singapore BV Delivered
NO. PROJECT TITLE P/O NO BUYER CLASS DELIVERY DATE STATUS PROJECT
1 34M Crewboat Gagasan (Hull No.1080) - Alarm System & Starter Panel 0035 NGV Tech 09 Nov 07 Delivered
2 38M Dinastia Jati (Hull No.1083) - Air Condition Panel 0016 DANUS S.B 16 Nov 07 Delivered
3 15M Patrol Craft (Hull No.1099 & 1100) - Starter Fan - Box for Remote Anchor Windless 0080 NGV Tech 06 Dec 07 Delivered
4 38M Dinastia Jati (Hull No.1083) - CCTV 0139 NGV Tech 10 Dec 07 Delivered
5 38M Dinastia Jati (Hull No.1083) - Supply Electrical Equipment 0149 NGV Tech Delivered
6 41M Ajang Sentosa & Subu (Hull No.1072 & 1073) - Starter Fan & Starter Pump 0192 NGV Tech 04 Mar 08 Delivered
7 34M Warisan Alam (Hull No.1119 & 1120) - Battery Isolator - Interface Bus bare 0057 NGV Tech 01 Apr 08 Delivered
8 15M Patrol Craft (Hull No.1036, 1037 & 1038) - On/Off Change Over Switch 0195 NGV Tech 22 May 08 Delivered
9 22M Offshore Port Limit (Hull No.1176,1177 &1178) - DB Change Over Switch 0041 NGV Tech 27 June 08 Delivered
10 65T Offshore Terminal Docking Tug (Hull No.1090) - Console 0156 NGV Tech 28 Nov 08 Delivered
11 AHTSSV 60M Bollard Pull Tug (Hull No.1097) - Starter Pump 0035 NGV Tech 28 Nov 08 Delivered
12 60m AHSTSSV Bollard Pull Tug (Hull No.1095) - Starter GS and Fire Pump c/w Door Interlock 0124 NGV Tech 07 Jan 09 Delivered
13 34M Crewboat Gagasan (Hull No.1081) Baycorp Subang - Name Tally 0409 NGV Tech 13 Jan 09 Delivered
14 34M Crewboat (Hull No.1187) - Bilge Alarm System 0025 NGV Tech 14 Jan 09 Delivered
15 34M Crewboat (Hull No.1182) - Starter Panels 0085 NGV Tech 19 May 09 Delivered
16 60m AHSTSSV Bollard Pull Tug (Hull No.1093) - Alarm and Monitoring System (Redundant PLC) 0177 NGV Tech 08 Jun 09 Delivered
17 60m AHSTSSV Bollard Pull Tug (Hull No.1094) - Alarm and Monitoring System (Redundant PLC) 0170 NGV Tech 08 Jun 09 Delivered
18 60m AHSTSSV Bollard Pull Tug (Hull No.1095) - Alarm and Monitoring System (Redundant PLC) 0157 NGV Tech 08 Jun 09 Delivered
19 60m AHSTSSV Bollard Pull Tug (Hull No.1096) - Alarm and Monitoring System (Redundant PLC) 0158 NGV Tech 08 Jun 09 Delivered
20 60m AHSTSSV Bollard Pull Tug (Hull No.1097) - Alarm and Monitoring System (Redundant PLC) 0055 NGV Tech 08 Jun 09 Delivered
21 100M 300MEN Accommodation Crane Barge (Hull No.1150) - Console 0154 NGV Tech 30 Sep 09 Delivered
22 Man Power for SSAA Power Station (TNB Kapar) 3760001227 ABB 25 May 09 Delivered
23 Control Panel 090065 Radical Control S.B 24 Jun 09 Delivered
24 Anchor Handling Tug L017 Bousted Penang S.S.B 04 Nov 09 Delivered
25 Air Condition Panel DNS/07015 DANUS S.B 11 Nov 09 Delivered
26 Throttle Control Panel ASSB/3191 Ajang Shipping S.B 22 Dec 09 Delivered
27 34M Crewboat BIMA PIASAU (Hull No.1115) - Alarm Panel for Bilge, Tank and Door 0154 NGV Tech 26 Jan 10 Delivered
28 34M Crewboat (Hull No.1182) - Man Over Board (MOB) 0146 NGV Tech 26 Jan 10 Delivered
29 34M Crewboat (Hull No.1187) - Ventilation Fan Fault Alarm 0097 NGV Tech 30 Jan 10 Delivered
30 34M Crewboat BIMA PIASAU (Hull No.1115) - Emergency Gear Box Throttle 0173 NGV Tech 05 April 10 Delivered
31 52M Crewboat (Hull No.1182) - CCTV 0082 NGV Tech 19 May 10 Delivered
32 37M Multi Purpose Oil Recovery Fifi Tug (Hull No.1117) - Alarm and Monitoring System Control (Redundant PLC) 0105 NGV Tech 25 Aug 10 Delivered
33 37M Multi Purpose Oil Recovery Fifi Tug (Hull No.1118) - Alarm and Monitoring System Control (Redundant PLC) 0094 NGV Tech 25 Aug 10 Delivered
34 Retrofitting Feeder Panel for Bukit Raja ABB100826 ABB MALAYSIA 26 Aug 10 Delivered
35 36M Rabigh Tug (Hull No.1199) (Marine Service Co.LTD) - Redundant PLC For Alarm and Monitoring System 0036 NGV Tech 27 Nov 10 Delivered
36 36M Rabigh Tug (Hull No.1200) (Marine Service Co.LTD) - Redundant PLC For Alarm and Monitoring System 0033 NGV Tech 27 Nov 10 Delivered
37 36M Rabigh Tug (Hull No.1201) (Marine Service Co.LTD) - Redundant PLC For Alarm and Monitoring System 0030 NGV Tech 27 Nov 10 Delivered
38 36M Rabigh Tug (Hull No.1202) (Marine Service Co.LTD) - Redundant PLC For Alarm and Monitoring System 0030 NGV Tech 27 Nov 10 Delivered
39 Vacuum and Accessories SM/0100 Selat Melaka S.C.S.B 18 Mar 10 Delivered
40 34M Crewboat Safir Kish 3 (Hull No.1159) - Engine Exhaust Cooling Temperature 0426 NGV Tech 24 Feb 11 Delivered
41 34M Crewboat Safir Kish 3 (Hull No.1159) - Modification Console 0426 NGV Tech 24 Feb 11 Delivered
42 Site Wiring Works for RTCC 1&2 3760002877 ABB 11 April 11 Delivered
43 ESD Panel Wiring RCPO-11-0177 Radical Control S.B 15 Aug 11 Delivered
44 34M Crewboat Seputeh (Hull No.1115) - CCTV 0148 NGV Tech 09 Sept 11 Delivered
45 Cable for Wiring IGE/PO11/4011 Leisure Harbour Sdn Bhd 05 Sept 11 Delivered
46 Supply CCD Camera - Waterproof infrared camera - Sony Super head CCD sensor - Stainless Steel overall housing H126-EL-B198 Bousted Penang Shipyard Sdn Bhd 23 Sept 11 Delivered
47 Site Installation at Subang Maritime Airport RCPO-11-0178 Radical Control 14 Dec 11 Delivered
48 Dismantle, supply & install battery charger at AG Surveyor Asian Goes 20 Jun 13 Delivered
49 Dismantle & install new ducting at AG Surveyor Asian Goes 20 Jun 13 Delivered
50 Wiring Blower fan for CO2 & Compressor for AG Surveyor Asian Goes 04 Jul 13 Delivered
51 Supply CO2 & battery room & Ventilation fan for AG Surveyor Asian Goes 04 Jul 13 Delivered
52 Supply pipe for air vent for AG Surveyor Asian Goes 10 Jul 13 Delivered
53 75.9 meter vessel, electrical component replacement work & services NGV Tech 11 Jul 13 Delivered
54 CTM Auto Length Measurement System Continental 22 Jul 14 Delivered
55 4 Bowl Major Repair Project Continental 24 Jul 14 Delivered
56 PT100 Project 2014 Continental 24 Jul 14 Delivered
57 ISCP 2014 M&E Project Continental 22 Sept 14 Delivered
58 Installation Tyre Scanning Continental 12 Dec 14 Delivered
59 Repair Making Good Lighting Top Machine Continental 16 Feb 15 Delivered
60 Rearrange Switch Location And Replace T5 Continental 16 Feb 15 Delivered
61 Inspectomat No.9 & 10 HW Standardized Continental 26 Feb 15 Delivered
62 Dismantle Hardware Continental 15 March 15 Delivered
63 ISCP Hardware Installation Continental 07 Aug 15 Delivered
64 Push Button and Wiring Hardware & Supply Fencing Material Continental 17 Aug 15 Delivered
65 DB Local Installation Continental 17 Sept 15 Delivered